ULVAC sorption and getter pump zeolite cartridge schematic diagram

ULVAC Sorption and Getter Pumps

Sorption pumps achieve roughing vacuum without oil by adsorbing gas molecules onto zeolite molecular sieve cooled in liquid nitrogen. No moving parts, no oil, no vibration. Essential where hydrocarbon contamination of the process chamber is unacceptable. The ULVAC PSM-010B has an NW25 inlet. Two units in series can rough from atmosphere to below 1 Pa before starting a turbomolecular or ion pump.

Part Numbers

Operating Principle

The PSM-010B contains approximately 200 g of 5A zeolite. Immersion in liquid nitrogen dramatically increases the surface adsorption capacity. Nitrogen, oxygen, water vapour, CO2, and argon are efficiently adsorbed. Helium and hydrogen are NOT adsorbed efficiently at liquid nitrogen temperature and remain in the system. Supplement with a NEG cartridge or titanium sublimation pump if these gases must be reduced.

Commissioning and Operating Procedure

  1. Close the inlet valve between the sorption pump and the vacuum system
  2. Fill the dewar with liquid nitrogen — submerge the pump body cylinder; do not cover the inlet flange
  3. Allow 15 minutes minimum cool-down before opening the inlet valve
  4. Open the inlet valve slowly while monitoring the vacuum gauge
  5. When pumping rate slows, close the inlet valve — zeolite approaching saturation
  6. For two-stage roughing: cool the second pump 15 minutes, then open its inlet valve
  7. When target rough vacuum achieved, close inlet valve and start the high-vacuum pump

Regeneration

  1. Confirm inlet valve fully closed
  2. Remove dewar or allow pump to warm to room temperature (20 to 40 minutes)
  3. Open vent valve slowly to release gas to atmosphere — never back into the vacuum system
  4. Once fully vented and at room temperature, ready for next cycle

Fault Diagnosis

SymptomCauseAction
Pressure does not drop below 1000 PaInsufficient cool-down; LN2 level lowWait full 15+ minutes after LN2 fill; top up LN2
Reduced capacity vs previous cycleZeolite not fully regeneratedAllow full warm-up and complete venting
Rapid pressure rise after closing inletZeolite saturated; moisture in gasShorten pumping cycle; verify process gas is dry
Leak at inlet flangeNW25 o-ring damagedReplace inlet o-ring; clean flange faces
Permanently reduced capacityZeolite contaminated with solvents or waterWorkshop bakeout at 300 C in air, or zeolite replacement
He/H2 background not reducedExpected — zeolite does not pump these gases at LN2 temperatureAdd NEG cartridge or titanium sublimation pump

Maintenance

  • NW25 inlet o-ring: replace at each system open or annually
  • Dewar: check for insulation loss (abnormal external frosting); replace dewar if insulation failed
  • After approx 500 cycles or clear capacity loss: arrange zeolite replacement or workshop bakeout regeneration
  • Heater element (part 200000180400): replace if resistance out of specification
  • Alloy filament set (part 210004540500, 6 pcs): replace when getter capacity exhausted
  • Molecular sieve material (part 210004540100, 5A, 1 kg): available for zeolite replenishment

Training

Operator training: LN2 handling and PPE, cool-down and venting procedure, two-stage roughing sequence, integration with TMP startup, recognising zeolite capacity degradation. Maintenance training: o-ring replacement, zeolite inspection, bakeout regeneration. Contact mail@ulvacheliot.com — provide: pump model, number of attendees, site location.

Service Enquiry

Email mail@ulvacheliot.com — provide: pump model (PSM-010B), serial number, fault or items required. Available: NW25 o-ring, alloy filament set (210004540500), heater element (200000180400), molecular sieve (210004540100).

Independent HELIOT Equipment Service

Independent third-party maintenance, commissioning and training provider for ULVAC HELIOT helium mass spectrometer leak detectors. We are not the manufacturer and do not sell new ULVAC equipment. Worldwide on-site support.

mail@ulvacheliot.com


Independent service provider notice: This website is operated by an independent, third-party technical service organisation. We provide on-site and remote maintenance, commissioning, repair and training services for existing ULVAC HELIOT equipment already owned or procured by our customers. We are not ULVAC Corporation, not a subsidiary, dealer, distributor, or authorised representative of ULVAC Corporation, and we do not sell new ULVAC equipment. ULVAC® and HELIOT® are registered trademarks of ULVAC Corporation (Japan), used here solely in a descriptive, nominative sense to identify the equipment we service. | Full Trademark Disclaimer | Contact